LEED / Sustainable Construction |  | Constitution Center Location: Washington, DC Duration: 28 Months 1,500,000-SF base building renovation 600,000-SF parking garage | | |  | Courtyard Marriott @ 5520 Wisconsin Ave Location: Chevy Chase, MD Duration: 10 Months 170,400-SF base building & interior renovation | | |  | 1999 K Street Location: Washington, DC Duration: 25 Months 296,300-SF base building 53,000-SF below-grade parking garage | | |  | 1100 First Street, NE Location: Washington, DC Duration: 25 Months 380,500-SF base building 120,400-SF below-grade parking garage | | |  | United States Green Building Council (USGBC) 2008 Location: Washington, DC Duration: 5 Months 75,000-SF interior build-out | | |  | 1225 Connecticut Avenue, NW Location: Washington, DC Duration: 16 Months 228,000-SF base building renovation | | |  | United States Green Building Council Location: Washington, DC Duration: 4 Months 22,500-SF LEED PLATINUM interior build-out | | |  | Potomac Yard One and Two, Land A Location: Arlington, VA Duration: 23 Months 610,000-SF base building 434,000-SF below-grade garage | | |  | Nusta Spa Services Location: Washington, DC Duration: 5 Months 4,600-SF interior build-out | | | | View Additional LEED / Sustainable Construction |
|
|
|