VIEW ALL |
 | C2-CNT East Facility Location: Aberdeen Proving Ground, MD Duration: 27 Months 537,700-SF base building and interior build-out | |
|
 | Episcopal High School - Gymnasium Renovation Location: Alexandria, VA Duration: 22 Months 97,000-SF renovation & addition | |
|
 | Constitution Center Location: Washington, DC Duration: 28 Months 1,500,000-SF base building renovation 600,000-SF parking garage | |
|
 | Courtyard Marriott @ 5520 Wisconsin Ave Location: Chevy Chase, MD Duration: 10 Months 170,400-SF base building & interior renovation | |
|
 | 1999 K Street Location: Washington, DC Duration: 25 Months 296,300-SF base building 53,000-SF below-grade parking garage | |
|
 | 1100 First Street, NE Location: Washington, DC Duration: 25 Months 380,500-SF base building 120,400-SF below-grade parking garage | |
|
 | 1900 Half Street, SW Location: Washington, DC Duration: 57 Months 500,000-SF base building renovation
280,000-SF GSA interior build-out for U.S. Coast Guard
70,000-SF GSA interior build-out for Federal Protective Services
250,000-SF parking garage renovation | |
|
 | United States Green Building Council (USGBC) 2008 Location: Washington, DC Duration: 5 Months 75,000-SF interior build-out | |
|
 | 1155 F Street, NW Location: Washington, DC Duration: 25 Months 302,300-SF base building renovation 74,300-SF below-grade parking garage | |
|
 | 1225 Connecticut Avenue, NW Location: Washington, DC Duration: 16 Months 228,000-SF base building renovation | |
|
 | Ford's Theatre Lobby Location: Washington, DC Duration: 6 Months 5,100-SF interior renovation | |
|
 | cityVista at 5th and K Location: Washington, DC Duration: 34 Months 764,000-SF residential 321,000-SF below-grade parking 163,000-SF retail | |
|
 | Corporate Executive Board Location: Arlington, VA Duration: 14 Months 625,000-SF interior build-out | |
|
 | Long & Foster Headquarters - The Ellipse at Westfields Location: Chantilly, VA Duration: 18 Months 285,000-SF base building and interior build-out 405,000-SF above-grade parking garage | |
|
 | Lionsgate @ Woodmont Corner Location: Bethesda, MD Duration: 24 Months 291,400-SF base building 110,400-SF below-grade parking garage | |
|
 | I. Gorman Jewelers Location: Washington, DC Duration: 5 Months 3,300-SF interior renovation | |
|
 | Senate Square Towers Location: Washington, DC Duration: 30 Months 560,000-SF residential
175,000-SF garage | |
|
 | American Speech-Language-Hearing Association Location: Rockville, MD Duration: 15 Months 137,000-SF base building 120,000-SF parking garage | |
|
 | Madame Tussauds Location: Washington, DC Duration: 6 Months 19,500-SF interior build-out and historic renovation | |
|
 | New GSA Federal Office Building Location: Washington, DC Duration: 36 Months 426,600-SF LEED base building | |
|
 | Service Employees International Union Location: Washington, DC Duration: 28 Months 160,000-SF LEED interior renovation and build-out | |
|
 | United States Green Building Council Location: Washington, DC Duration: 4 Months 22,500-SF LEED PLATINUM interior build-out | |
|
 | Capital One Lecture Hall Location: McLean, VA Duration: 14 Months 20,400-SF base building | |
|
 | Burgin Center For The Arts Location: Mercersburg, PA Duration: 20 Months 65,500-SF base building and interiors | |
|
 | Dickstein Shapiro, LLP Location: Washington, DC Duration: 12 Months 417,000-SF interior build-out | |
|
 | Chevy Chase Center Location: Chevy Chase, MD Duration: 32 Months 412,000-SF office and retail space
250,000-SF below-grade parking garage | |
|
 | Sidwell Friends School Location: Washington, DC Duration: 11 Months 191,000-SF below-grade garage and sports field | |
|
 | Alston & Bird Location: Washington, DC Duration: 9 Months 119,000-SF law firm build-out | |
|
 | Public Broadcasting Service Location: Arlington, VA Duration: 9 Months 131,500-SF office and network operations center build-out | |
|
 | Potomac Yard One and Two, Land A Location: Arlington, VA Duration: 23 Months 610,000-SF base building 434,000-SF below-grade garage | |
|
 | Ventana, The Location: Washington, DC Duration: 20 Months 98,800-SF
residential
10,800-SF retail | |
|
 | Maret School Phase II Location: Washington, DC Duration: 14 Months 43,000-SF renovation 40,000-SF new base building | |
|
 | Potomac Center Location: Washington, DC Duration: 50 Months 960,000-SF base building renovation 155,000-SF below-grade garage | |
|
 | Laboratory for Telecommunications Sciences Location: College Park, MD Duration: 20 Months 85,000-SF base building & interior build-out | |
|
 | Richmond City Hall Location: Richmond, VA Duration: 24 Months 250,000-SF facade renovation
| |
|
 | Sixth Street Flats Location: Washington, DC Duration: 13 Months 36,000-SF condominium building
| |
|
 | Discovery Communications - US Networks Origination and Information Technology Disaster Recovery Facility Location: Sterling, VA Duration: 12 Months 60,000-SF mission critical broadcast facility
| |
|
 | Takoma Aquatic Center Location: Washington, DC Duration: 12 Months 54,000-SF base building renovation & addition | |
|
 | White & Case, LLP Location: Washington, DC Duration: 8 Months 120,000-SF interior build-out | |
|
 | George Mason University, Academic Building IIIA Location: Manassas, VA Duration: 21 Months 102,000-SF base building | |
|
 | McKinley Technology High School Location: Washington, DC Duration: 25 Months 500,000-SF historic renovation | |
|
 | FDIC, Risk Analysis Center Location: Washington, DC Duration: 4 Weeks 1,000-SF fast track interior build-out | |
|
 | Nusta Spa Services Location: Washington, DC Duration: 5 Months 4,600-SF interior build-out | |
|
 | Environmental Protection Agency at the Woodies Building Location: Washington, DC Duration: 5 Months 50,000-SF interior build-out | |
|
 | Woodward and Lothrop Building Location: Washington, DC Duration: 22 Months 500,000-SF base building renovation | |
|
 | VOB BMW Location: Rockville, MD Duration: 13 Months 48,000-SF base building and interior build-out 64,000-SF above-grade parking garage | |
|
 | Franklin Square North Location: Washington, DC Duration: 16 Months 280,100-SF base building 86,600-SF below-grade parking garage | |
|
 | Palette at Madison Hotel Location: Washington, DC Duration: 5 Months 5,200-SF high-end interior build-out | |
|
 | Cabot Tech Location: Herndon, VA Duration: 5 Months 89,514-SF high-tech GSA build-out | |
|
 | O'Melveny & Myers, LLP Location: Washington, DC Duration: 7 Months 136,000-SF law office build-out | |
|
 | Suburban Wellness Center Location: Germantown, MD Duration: 11 Months 65,000-SF base building and interior build-out | |
|
 | Washington Capitals, The Location: Washington, DC Duration: 3 Months 4,000-SF interior renovation | |
|
 | WJLA / News Channel 8 Location: Arlington, VA Duration: 5 Months 77,000-SF tenant build-out | |
|
 | United Brotherhood of Carpenters And Joiners of America Location: Washington, DC Duration: 8 Months 23,000-SF interior build-out | |
|
 | 800 F Street, NW - The Historic Row Location: Washington, DC Duration: 26 Months 130,000-SF historic building renovation and new addition | |
|
 | Zola and Spy City Cafe Location: Washington, DC Duration: 4 Months Two restaurants for the International Spy Museum | |
|
 | International Spy Museum Location: Washington, DC Duration: 12 Months 52,000-SF interior build-out | |
|
 | George Mason National Memorial Location: Washington, DC Duration: 13 Months Memorial site construction | |
|
 | American Council of Life Insurers Location: Washington, DC Duration: 7 Months 150,000-SF interior build-out
| |
|
 | Executive Office of the Mayor Location: Washington, DC Duration: 5 Months +165,000-SF occupied interior renovation | |
|
 | Smithsonian Institution, The Victor Building Location: Washington, DC Duration: 5 Months 330,000-SF interior build-out | |
|
 | Metropolitan Police Department Multi-Agency Control Center Location: Washington, DC Duration: 6 Weeks 5,000-SF interior fit-out | |
|
 | Seven Skyline Place Location: Falls Church, VA Duration: 22 Months 608,000-SF base building & concurrent interior build-out 70,000-SF research & development laboratory 110,000-SF below-grade parking garage | |
|
 | Round House Theatre Location: Bethesda, MD Duration: 12 Weeks 7,500-SF interior build-out | |
|
 | National Wildlife Federation Location: Reston, VA Duration: 12 Months 95,000-SF base building and interior build-out | |
|
 | Pope John Paul II Cultural Center Location: Washington, DC Duration: 24 Months 97,000-SF base building and interior build-out | |
|
 | XM Satellite Radio Location: Washington, DC Duration: 12 Months 149,000-SF interior build-out | |
|
 | General Cinema Theatres at Mazza Gallerie Location: Washington, DC Duration: 24 Months New multiplex theatre construction | |
|
 | Mazza Gallerie Location: Washington, DC Duration: 24 Months 175,000-SF occupied base building renovation | |
|
 | Marymount University Location: Arlington, VA Duration: 12 Months 70,000-SF base building renovation and expansion | |
|
 | 1500 Eckington Place, NE Location: Washington, DC Duration: 14 Months 300,000-SF historic building renovation 249,000-SF high-tech interior construction | |
|
 | Georgetown Visitation Preparatory School Performing Arts Center Location: Washington, DC Duration: 12 Months Renovation and expansion to create a 16,000-SF performing arts
center | |
|
 | Friendship Centre Location: Washington, DC Duration: 16 Months 174,000-SF base building for retail tenants
| |
|
 | Brookings Institution, The Location: Washington, DC Duration: 13 Months 80,000-SF base building renovation | |
|
 | Commonwealth Tower Location: Arlington, VA Duration: 16 Months 350,000-SF base building renovation | |
|
 | Booz Allen Hamilton Location: Arlington, VA Duration: 3 Months 30,000-SF interior build-out | |
|
 | Black Entertainment Television Media Campus Location: Washington, DC Duration: 12 Months A corporate headquarters, production facility, and network operations
building
| |
|
| View Additional VIEW ALL |