Office Buildings |  | Constitution Center Location: Washington, DC Duration: 28 Months 1,500,000-SF base building renovation 600,000-SF parking garage | | |  | 1155 F Street, NW Location: Washington, DC Duration: 25 Months 302,300-SF base building renovation 74,300-SF below-grade parking garage | | |  | Long & Foster Headquarters - The Ellipse at Westfields Location: Chantilly, VA Duration: 18 Months 285,000-SF base building and interior build-out 405,000-SF above-grade parking garage | | |  | American Speech-Language-Hearing Association Location: Rockville, MD Duration: 15 Months 137,000-SF base building 120,000-SF parking garage | | |  | New GSA Federal Office Building Location: Washington, DC Duration: 36 Months 426,600-SF LEED base building | | |  | Sidwell Friends School Location: Washington, DC Duration: 11 Months 191,000-SF below-grade garage and sports field | | |  | Potomac Yard One and Two, Land A Location: Arlington, VA Duration: 23 Months 610,000-SF base building 434,000-SF below-grade garage | | |  | Potomac Center Location: Washington, DC Duration: 50 Months 960,000-SF base building renovation 155,000-SF below-grade garage | | |  | Woodward and Lothrop Building Location: Washington, DC Duration: 22 Months 500,000-SF base building renovation | | |  | Franklin Square North Location: Washington, DC Duration: 16 Months 280,100-SF base building 86,600-SF below-grade parking garage | | |  | Commonwealth Tower Location: Arlington, VA Duration: 16 Months 350,000-SF base building renovation | | | | View Additional Office Buildings |
|
|
|