|
|
Museums |  | Ford's Theatre Lobby Location: Washington, DC Duration: 6 Months 5,100-SF interior renovation | | |  | Madame Tussauds Location: Washington, DC Duration: 6 Months 19,500-SF interior build-out and historic renovation | | |  | International Spy Museum Location: Washington, DC Duration: 12 Months 52,000-SF interior build-out | | |  | George Mason National Memorial Location: Washington, DC Duration: 13 Months Memorial site construction | | |  | Smithsonian Institution, The Victor Building Location: Washington, DC Duration: 5 Months 330,000-SF interior build-out | | |  | Pope John Paul II Cultural Center Location: Washington, DC Duration: 24 Months 97,000-SF base building and interior build-out | | | | View Additional Museums |
|
|
|