| Booz Allen Hamilton | Arlington, VA 30,000-SF interior build-out OWNER:London and Leeds
ARCHITECT:Gensler
DURATION:3 Months The second floor build-out of the prominent Ballston
Station complex included offices, computer rooms, and simulator bays for Booz
Allen & Hamilton. Steel floors, walls, and ceilings for high security
SCIF spaces were installed, as well as raised computer flooring. Security
offices and a secure telephone system were also incorporated into the
space. Additionally, the power systems were upgraded and a UPS system
installed. HVAC capacities were also upgraded in order to handle the
computer and weapons systems' simulator heat loads. IMAGE BY:Carol Highsmith | |
|
|
|
|