map
 

Booz Allen Hamilton

Arlington, VA

30,000-SF interior build-out

OWNER:

London and Leeds

ARCHITECT:

Gensler

DURATION:

3 Months

The second floor build-out of the prominent Ballston Station complex included offices, computer rooms, and simulator bays for Booz Allen & Hamilton.  Steel floors, walls, and ceilings for high security SCIF spaces were installed, as well as raised computer flooring.  Security offices and a secure telephone system were also incorporated into the space.  Additionally, the power systems were upgraded and a UPS system installed.  HVAC capacities were also upgraded in order to handle the computer and weapons systems' simulator heat loads.

IMAGE BY:

Carol Highsmith