| Cabot Tech | Herndon, VA89,514-SF high-tech GSA build-out OWNER:Akridge
OWNER'S REPRESENTATIVE:U.S. General Services Administration (GSA)
ARCHITECT:M Group Architects, The
DURATION:5 Months Cabot Tech is an interior build-out of a single story, high bay shell that required extensive
site modifications for both perimeter and entrance security and equipment
accommodations. The client is two components of a federal government
agency tasked with both monitoring and crisis management of national transportation
issues and the daily scheduling and dispatch of the federal air marshal
force on a national level. The finished project includes a 24/7 mission
critical facility supporting two separate NOC type functions, traditional hard wall and
systems furniture office areas, a fitness facility with shower facilities, four
core restrooms, equipment support spaces, an exterior generator/chiller
equipment yard, and reconfigured site entrances. Support equipment
includes two 1.5 MW gensets with integral fuel tanks in acoustical enclosures,
two 500 kVA UPS with 15 minute batteries, three 120 ton chillers, 25 CRAC units
of various tonnage capacities, 13 RTUs, utility, paralleling and emergency
distribution switchgear. All 24/7 support equipment is provided in an N +
1 configuration. AWARDS:Merit Award